SAV Systems has won a contract to supply LoadTracker combined heat and power (CHP) units to supply residential apartments being constructed in the first phase of the Bromley by Bow North redevelopment in East London.

loadtracker-logo

Phase 1 (Hancock Road) of this development by East Thames Group and Southern Housing Group will create 219 residential units and over 1,000m2 of commercial space, constructed by Higgins Construction on a brown field site alongside the River Lea.

The residential accommodation will be supplied with heating and domestic hot water by three LoadTracker XRGI 20 CHP units, each with a capacity of up to 20kWe/40kWth. Crucially, unlike fixed output CHP units, LoadTracker units modulate to track demand, thereby maximising run times and energy efficiency.

SAV was specified for the project on the basis of the quality of the products and the company’s proven track record in providing exceptional technical support from design stage through to commissioning and ongoing operation.